Font Size: A A A
Go to:
×
More in Land Transport: Automobile | Train
Voyage Search
General Shipping Search
Please select a port in Israel
Please select a port overseas
Exports from Israel
Imports to Israel
Tools & Calculators
Currencies
Update date: 20.07.2019
Currency Rate % Change
USD 3.535 -0.226
EUR 3.9801 +0.123
GBP 4.4265 +0.066
100 JPY 3.2852 0
Currency calculator
Calculators
length area vol. weight
cm
m
km
inch
foot
yard
mile
Clear
square cm
square m
square km
square inch
square yard
square mile
Clear
cc
litre
cubic m
cubic inch
cubic yard
gallon
Clear
kg
short ton
long ton
lb
oz
Clear
Volume Weight Calculator
Ports' Workplan

Minister of Transport Katz: Road 6 to be extended north

Katz submitted a proposal for the extension of sections 3 and 7, which involves building a road between Yokne'am and Somekh Junction in the western Galilee
08.11.10 / 00:00
Minister of Transport Katz: Road 6 to be extended north
08.11.10
Minister of Transport Katz: Road 6 to be extended north

Katz submitted a proposal for the extension of sections 3 and 7, which  involves building a road between Yokne'am and Somekh Junction in the western Galilee
 
Minister of Transport Israel Katz submitted last week a proposal to the cabinet for the extension of sections 3 and 7 of Road 6, Yitzhak Rabin Highway. The proposal involves building a road between Yokne'am and Somekh Junction in the western Galilee.
 
In a press release published by the Ministry the Minister noted that "This is the greatest contribution that we can give the residents of the north".
 
Section 7 is a five-kilometer stretch between Yokne'am and the Tel Kashish interchange. The section will include a 1.7-kilometer tunnel to bypass the town of Yokne'am.
 
Section 3 is a 12-kilometer stretch between Tel Kashish via Ha'amakim interchange to the Somekh interchange. The section will include two tunnels: the two-kilometer Rekhesim tunnel and the 400-meter Ibtin tunnel.
 
 The section will also include upgrading two sections of Road 70, which will become part of Road 6. There will be no toll on these two sections.
 
Minister Katz noted that statutory plans for sections 3 and 7 were already undergoing the approval process at the relevant planning commissions.

 

×