Font Size: A A A
Go to:
×
Voyage Search
General Shipping Search
Please select a port in Israel
Please select a port overseas
Exports from Israel
Imports to Israel
Tools & Calculators
Currencies
Update date: 16.07.2019
Currency Rate % Change
USD 3.542 +0.085
EUR 3.9756 -0.371
GBP 4.4018 -0.856
100 JPY 3.2811 +0.058
Currency calculator
Calculators
length area vol. weight
cm
m
km
inch
foot
yard
mile
Clear
square cm
square m
square km
square inch
square yard
square mile
Clear
cc
litre
cubic m
cubic inch
cubic yard
gallon
Clear
kg
short ton
long ton
lb
oz
Clear
Volume Weight Calculator
Ports' Workplan

"Fridenson Logistic services" concluded highly complicated turn –key transportation project

Fridenson logistic services ltd. one of Israel's most experienced logistic project contractors concluded a multinational project in which complete industrial plants were moved from Australia and Belgium and were re-assembled in Mexico
02.08.04 / 00:00
"Fridenson Logistic services" concluded  highly complicated turn –key transportation project
02.08.04
"Fridenson Logistic services" concluded highly complicated turn –key transportation project

"Fridenson Logistic services" concluded  highly complicated turn –key transportation project – moving  complete plants from Australia and Belgium to Mexico.
 
Fridenson  logistic services ltd. one of Israel's most experienced logistic project contractors concluded a multinational project in which complete industrial plants were moved from Australia and Belgium and were re-assembled in Mexico.
 
The industrial plants owned by Messers Treofen, a European company which runs production facilities in nine locations world wide. Treofen's business as well as production activities had recently  been taken over by Dor Film an Israeli company.
 
Fridenson had to move the first plant from Sydney Australia to the Mexican city of Zakafo located some 300 km. from Mexico City and a second plant from Liege in Belgium to same location in Mexico.
 
MR. Avner Ben Shefer who ran the project said that the company encountered highly complicated logistic problems mainly involved in packing very heavy duty items and arranged the surface transportation from origin to final destination as well as on site erection of the plants.
 
The project lasted three months during which the company's know-how, mainly in packing heavy duty items and innovation in moving heavy duty item was at its best.
 

 

×